The "transition period" starts on July 1st, 2026 and finish on June 30th, 2028.
By the end of the transition period, the only way to connect to WIPO DAS will be via the DAS Office Portal or via REST API V2.
| Country | IP Office | Current means of connection | Production date for V1 | Testing status V1 | Estimation for migrating to V2 | Testing status V2 | Notes |
|---|---|---|---|---|---|---|---|
| US | USPTO | REST API V1 | 22 September 2025 | PROD | Q3 2026 | USPTO V2 Retrieval test completed | DAS PDDP retrieval tests from USPTO to start in 08/2026. |
| KR | MOIP | TDA | straight to V2 | 2027 | Discussion being held in relation of server security (variable DAS IP addresses might be issue for MOIP) Potential participation in pilot in wave 1 (Q1 2027) | ||
| CN | CNIPA | TDA | straight to V2 | 2027 | Test expected to start at the end of 2026 | ||
| EP | EPO | TDA | straight to V2 | 2027 | Setting up connection DAS/EPO in TEST environment. | Stating development of API REST infrastructure. Test for V1 to start after 08/2026 Production in Q3 2026 for API V1 | |
| JP | JPO | TDA | straight to V2 | 2028 | currently discussing server connectivity and security assurance of exchange through REST API | ||
| IB | WIPO | REST API V1 | October 2024 | PROD | Q1 2027 | ||
| DE | DPMA | REST API V1 | November 2024 | PROD | 2027 | DE setting up their environment to test V2 | |
| EM | EUIPO | TDA | partial prod July 2026 | EUIPO V1 Registration in PROD EUIPO V1 Status check in PROD EUIPO pending setup of own endpoints Pending DAS retrieval from EUIPO endpoints | 2027 | V2/PDDP testing and implementation to start on Q4/2026 | Might be ready in wave 1 (Q1 2027) |
| AU | IP Australia | REST API V1 | April 2026 | PROD | 2028 | Starting with exchange via REST API V1 and Office Portal Likely to be in wave 2 (after Q2 2027) | |
| ES | OEPM | SFTP | straight to V2 | 2027 | Planning stage | ||
| GB | UKIPO | SFTP | 2026 (*) | Test completed, waiting for implementation of API in UKIPO PROD system | 2027/2028 | (1) | |
| FR | INPI | Office Portal Bulk | Q1 2027 | 2028 | (1) | ||
| NZ | IPONZ | SFTP | 2028 | planning stage | |||
| SE | PRV | SFTP | 2027 | planning stage | |||
| IL | ILPO | SFTP | straight to V2 | 2027 | Project being developed to move directly to V2 | ||
| NO | NIPO | Office Portal | straight to V2 | 2027 | Project being developed for moving the DAS exchange to a combination of the Office Portal and DAS REST API V2 (Removed 2026, because it is not recommended to rollout the new version of the DAS Office Portal using API V2 if no other Offices are ready to operate with API V2 in 2026) | ||
| IS | IIPO | Office Portal | 2027/2028 |
(*) estimated
(1) waiting for estimation of V2 PROD date