The "transition period" starts on July  1st, 2026 and finish on June 30th, 2028.

By the end of the transition period, the only way to connect to WIPO DAS will be via the DAS Office Portal or via REST API V2.


CountryIP OfficeCurrent means of connectionProduction date for V1Testing status V1Estimation for migrating to V2Testing status V2Notes
USUSPTOREST API V122 September 2025PRODQ3 2026USPTO V2 Retrieval test completed

DAS PDDP retrieval tests from USPTO to start in 08/2026.

KRMOIPTDAstraight to V2
2027
Discussion being held in relation of server security (variable DAS IP addresses might be issue for MOIP)
Potential participation in pilot in wave 1 (Q1 2027)
CNCNIPATDAstraight to V2
2027
Test expected to start at the end of 2026
EPEPOTDAstraight to V2
2027Setting up connection DAS/EPO in TEST environment.Stating development of API REST infrastructure. Test for V1 to start after 08/2026
Production in Q3 2026 for API V1
JPJPOTDAstraight to V2
2028
currently discussing server connectivity and security assurance of exchange through REST API
IBWIPOREST API V1October 2024PRODQ1 2027

DEDPMAREST API V1November 2024PROD2027DE setting up their environment to test V2
EMEUIPOTDApartial prod July 2026

EUIPO V1 Registration in PROD 

EUIPO V1 Status check in PROD

EUIPO pending setup of own endpoints

Pending DAS retrieval from EUIPO endpoints

2027V2/PDDP testing and implementation to start on Q4/2026

Might be ready in wave 1 (Q1 2027)

AUIP AustraliaREST API V1April 2026PROD2028
Starting with exchange via REST API V1 and Office Portal
Likely to be in wave 2 (after Q2 2027)
ESOEPMSFTPstraight to V2
2027
Planning stage
GBUKIPOSFTP2026 (*)Test completed, waiting for implementation of API in UKIPO PROD system2027/2028
(1)
FRINPIOffice Portal BulkQ1 2027
2028
(1)
NZIPONZSFTP

2028
planning stage
SEPRVSFTP

2027
planning stage
ILILPOSFTPstraight to V2
2027
Project being developed to move directly to V2
NONIPOOffice Portalstraight to V2
2027
Project being developed for moving the DAS exchange to a combination of the Office Portal and DAS REST API V2
(Removed 2026, because it is not recommended to rollout the new version of the DAS Office Portal using API V2 if no other Offices are ready to operate with API V2 in 2026)
ISIIPOOffice Portal

2027/2028

(*) estimated

(1) waiting for estimation of V2 PROD date