You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

During the transition period for ST.92, the following change applies to how WIPO DAS handles documents that include additional files alongside the main PDF.

What's changing

When a DAS Registration contains additional files (beyond the core content PDF), the process will now follow these steps:

  1. The TDA Scheduler Job checks the WIPO DAS Registration table to determine whether the document includes any additional files.
  2. If additional files are detected, the system sends TDA Error Code 7 to the OSF.
  3. WIPO DAS then delivers the PDDP package via the oversize route (SFTP).


In PDDP package there are two cases 

  1. When PDDP package only has core pdf in it (no additional document) in this case TDA scheduler shares the core pdf with merged cover page  through TDA (similar to existing flow)
  2. When PDDP package has additional files with core pdf (may be supplementary files or mandatory folder has files like PNG or ST26 xml) in this case scheduler will share error code 7 and PDDP document will be shared through oversize route 


  • No labels